Electronic City metro station

Upcoming Namma Metro station under Yellow Line

Preceding station Namma Metro Following station
Konappana Agrahara Yellow Line
(Operational around November 2024)
Huskur Road
towards Bommasandra
Route map
Legend
Rashtreeya Vidyalaya Road
Green Line
Ragigudda
Jayadeva Hospital
Pink Line
Under Construction
BTM Layout
Central Silk Board
Blue Line
Under Construction
Bommanahalli
Hongasandra
Kudlu Gate
Singasandra
Hosa Road
Beratena Agrahara
Konappana Agrahara
Electronic City
Huskur Road
Hebbagodi
Mainline rail interchange Hebbagodi Depot (U/C)
Bommasandra
Location
Map

Electronic City is an upcoming elevated metro station on the Yellow Line of the Namma Metro in southern Bengaluru, India, being built to serve the Information technology hub in Anekal suburb. This will be the first metro station in the Namma Metro network to feature Platform screen doors (PSDs).[1] Alongside the metro station is the Electronic City Elevated Expressway connecting Central Silk Board to Electronic City, including the Infosys campus and Wipro Floating Learning Centre. To the north, the Yellow Line will lead to Konappana Agrahara and to the south to Bommasandra, Attibele and Hosur, an industrial city in Tamil Nadu.

As per latest reports, the Yellow Line is stated to be operational around November 2024 due to the upcoming Indian general election which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations. [2][3][4][5][6]

Station layout

Station Layout (TBC)

Electronic City track layout (TBC)
Legend
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Bommasandra next station is Huskur Road
Platform 1
Northbound
Towards ← Central Silk Board / Rashtreeya Vidyalaya Road next station is Konappana Agrahara
Side platform | Doors will open on the left Disabled access
L2

Entry/Exit

See also

References

  1. ^ "Metro stn at E-City will be 1st to have platform screen doors". The Times of India. 2023-07-29. ISSN 0971-8257. Retrieved 2023-07-31.
  2. ^ "Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details". TimesNow. 2024-03-09. Retrieved 2024-03-10.
  3. ^ DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 2023-12-14.
  4. ^ "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 2023-11-11.
  5. ^ "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 2023-10-21. ISSN 0971-8257. Retrieved 2023-11-11.
  6. ^ "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 2023-10-06. Retrieved 2023-11-11.

External links

  • BMRCL English Archived 2019-06-30 at the Wayback Machine - BMRCL Official Website
Portals:
  • icon Bangalore
  • icon Trains
  • icon Transport
  • icon Engineering