Kasturinagara metro station

Upcoming Namma Metro station under Blue Line

13°00′17″N 77°39′47″E / 13.00485°N 77.66318°E / 13.00485; 77.66318Owned byBangalore Metro Rail Corporation Ltd (BMRCL)Operated byNamma MetroLine(s)Blue LinePlatformsSide platform (TBC)
Platform-1 → Krishnarajapura / Central Silk Board
Platform-2 → KIAL Terminals
Platform Numbers (TBC)Tracks2 (TBC)ConnectionsMainline rail interchange Channasandra railway station
Bus interchange Kasthuri Nagar Bus Stop leading towards Tin Factory or HoramavuConstructionStructure typeElevated, Double trackPlatform levels2 (TBC)Parking(TBC)Accessible(TBC)Other informationStatusUnder ConstructionStation code(TBC)HistoryOpeningJune 2026; 23 months' time (June 2026) (TBC)Electrified(TBC)Services
Preceding station Namma Metro Following station
Krishnarajapura
towards Krishnarajapura or Central Silk Board
Blue Line
(Future Service)
Horamavu
Route map
Legend
Central Silk Board
Yellow Line
Under Construction
HSR Layout
Agara
Ibbaluru
Bellandur
Kadubeesanahalli
Kodibeesanahalli
Marathahalli
ISRO
Doddanekundi
DRDO Sports Complex
Sarasvathi Nagar
Krishnarajapuram Krishnarajapuram railway station
Purple Line
Mainline rail interchange Baiyappanahalli Depot (U/C)
Kasturi Nagar
Horamavu
HRBR Layout
Kalyan Nagar
HBR Layout
Nagawara
Pink Line
Under Construction
Veerannapalya
Kempapura
Orange Line
Proposed
Hebbal Hebbal railway station
Kodigehalli
Jakkur Cross
Jakkur Plantation (No Scope)
Yelahanka
Bagalur Cross
Bettahalasuru (No Scope)
Chikkajala
Doddajala
Mainline rail interchange Doddajala Depot (U/C)
Airport City
KIAL Terminals
Location
Map

Kasturi Nagar is an upcoming elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. It is located in the main Kasturinagar area consisting of residential buildings, followed by the main Channasandra railway station, RTO Office (Kasturinagar), Steel Authority of India (SAIL) (Kasturinagar) and Banasawadi Police Station. This metro station is slated to become operational around June 2026.[2][3][4][5]

Station layout

Station Layout - To Be Confirmed

Kasturi Nagar track layout (TBC)
Legend
P#
P#
to Krishnarajapura Purple Line
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Krishnarajapura / Central Silk Board next station is Krishnarajapura Change at the next station for Purple Line
Platform #
Northbound
Towards ← KIAL Terminals next station is Horamavu
Side platform | Doors will open on the left Disabled access
L2

Connections

This metro station will be connected with Channasandra of Indian Railways network and also will be connected with the Kasthuri Nagar bus stop leading towards Tin Factory or towards Horamavu.

Entry/Exit

See also

Portals:
  • icon Bangalore
  • icon Trains
  • icon Transport
  • icon Engineering

References

  1. ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.

External links

  • BMRCL English Archived 30 June 2019 at the Wayback Machine - BMRCL Official Website
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.