Kalena Agrahara metro station

Upcoming Namma Metro station under Pink Line

12°52′18″N 77°35′37″E / 12.87158°N 77.59363°E / 12.87158; 77.59363Owned byBangalore Metro Rail Corporation Ltd (BMRCL)Operated byNamma MetroLine(s)Pink LinePlatformsSide platform (TBC)
Platform-1 → Train Terminates Here
Platform-2 → Nagawara
Platform Numbers (TBC)Tracks2 (TBC)ConstructionStructure typeElevated, Double trackPlatform levels2 (TBC)Parking(TBC)Accessible(TBC)Other informationStatusUnder ConstructionStation code(TBC)HistoryOpeningMarch 2025; 8 months' time (March 2025) (TBC)Electrified(TBC)Services
Preceding station Namma Metro Following station
Hulimavu
towards Nagawara
Pink Line
(Future Service)
Terminus
Route map
Legend
Nagawara
Blue Line
Under Construction
Kadugundanahalli
Venkateshpura
Tannery Road
Pottery Town Bangalore East railway station
Cantonment Railway Station Bangalore Cantonment railway station
Shivaji Nagar
Mahatma Gandhi Road
Purple Line
National Military School
Langford Town
Lakkasandra
Dairy Circle
Tavarekere
Jayadeva Hospital
Yellow Line
Under Construction
JP Nagar 4th Phase
Orange Line
Planned
IIMB
Hulimavu
Mainline rail interchange Kothanur Depot (U/C)
Kalena Agrahara
Location
Map

Kalena Agrahara is an upcoming elevated southern terminal metro station on the North-South corridor of the Pink Line[1] of Namma Metro in Bangalore, India. This metro station serves residential properties and a few other locations including Prestige Elysian, Holy Spirit School (ICSE), Doddakammanahalli suburban area and Decathlon (Bannerghatta Road). This metro station is stated to become operational around Q4 of 2024 / March 2025.[2][3][4][5][6]

History

On March 2017, the Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for building the Kalena Agrahara metro station on the 7.5 km Kalena Agrahara - South Ramp section of the 21.25 km Pink Line of Namma Metro. This section comprises 5 stations, excluding Jayadeva Hospital, which was part of a joint venture between HCC - URC Constructions. Initially, Simplex Infrastructures won the tender in September 2017 but due to slow progress, their contract was terminated. [7] In July 2021, GR Infraprojects became the lowest bidder and was awarded the Rs 364.87 Crore contract for this section. They commenced the construction of this metro station as per the agreement. [8]

Station layout

Station Layout - To Be Confirmed [9]

Kalena Agrahara track layout (TBC)
Legend
P#
P#
to Train Terminates Here
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Train Terminates Here
Platform #
Northbound
Towards ← Nagawara next station is Hulimavu
Side platform | Doors will open on the left Disabled access
L2

Connections

Entry/Exit

See also

Portals:
  • icon Bangalore
  • icon Trains
  • icon Transport
  • icon Engineering

References

  1. ^ "Namma Metro Pink Line: Route, Status, Completion Date & More". timesproperty. Retrieved 15 December 2023.
  2. ^ "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
  3. ^ "Namma Bengaluru's Pink Line likely to commence commercial operations by March 2025! Check routes, stoppages, and more". Financialexpress. 18 July 2023. Retrieved 15 December 2023.
  4. ^ Staff Reporter (17 July 2023). "Bengaluru Metro: Pink Line likely to be Operationalised by March 2025". Metro Rail News. Retrieved 15 December 2023.
  5. ^ Staff Reporter (27 September 2023). "Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024". Metro Rail News. Retrieved 15 December 2023.
  6. ^ "Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week". TimesNow. 31 January 2024. Retrieved 1 February 2024.
  7. ^ "Bangalore Metro Terminates Simplex Infra's Pink Line Contract". The Metro Rail Guy. 4 February 2021. Retrieved 29 March 2024.
  8. ^ "GR Infra Wins Bangalore Metro Pink Line's Pending Work". The Metro Rail Guy. 16 July 2021. Retrieved 29 March 2024.
  9. ^ "Bengaluru Metro: Track-Laying Work Is Expected To Complete By Second Half Of 2024". News18. 28 September 2023. Retrieved 15 December 2023.

External links

  • BMRCL English Archived 30 June 2019 at the Wayback Machine - BMRCL Official Website
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
  • v
  • t
  • e
Pink Line 4
Depot(s)
  • Kothanur
See also
  • *Stations in Italics are Under Construction