Venkateshpura metro station

Upcoming Namma Metro station under Pink Line

13°01′03″N 77°37′04″E / 13.01757°N 77.61789°E / 13.01757; 77.61789Owned byBangalore Metro Rail Corporation Ltd (BMRCL)Operated byNamma MetroLine(s)Pink LinePlatformsIsland platform (TBC)
Platform-1 → Kalena Agrahara
Platform-2 → Nagawara
Platform Numbers (TBC)Tracks2 (TBC)ConstructionStructure typeUnderground, Double trackPlatform levels2 (TBC)Parking(TBC)Accessible(TBC)Other informationStatusUnder ConstructionStation code(TBC)HistoryOpeningMarch 2025; 8 months' time (March 2025) (TBC)Electrified(TBC)Services
Preceding station Namma Metro Following station
Kadugundanahalli
towards Nagawara
Pink Line
(Future Service)
Tannery Road
Route map
Legend
Nagawara
Blue Line
Under Construction
Kadugundanahalli
Venkateshpura
Tannery Road
Pottery Town Bangalore East railway station
Cantonment Railway Station Bangalore Cantonment railway station
Shivaji Nagar
Mahatma Gandhi Road
Purple Line
National Military School
Langford Town
Lakkasandra
Dairy Circle
Tavarekere
Jayadeva Hospital
Yellow Line
Under Construction
JP Nagar 4th Phase
Orange Line
Planned
IIMB
Hulimavu
Mainline rail interchange Kothanur Depot (U/C)
Kalena Agrahara
Location
Map

Venkateshpura is an upcoming underground metro station on the North-South corridor of the Pink Line[1] of Namma Metro in Bangalore, India. This metro station will consist of the main Venkateshpuram suburban area and ISKCON Temple & Goshala followed by other neighbouring suburban areas like Lingarajapuram, Ashok Nagar and Kushal Nagar. This metro station is stated to become operational around March 2025.[2][3][4][5][6]

History

In June 2017, Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for constructing the Venkateshpura metro station along the 4.59 km Shadi Mahal Ramp - North Ramp stretch of the 21.25 km Pink Line of Namma Metro. In November 2019, ITD Cementation India emerged as the lowest bidder for this stretch which aligned closely with the original estimate, thus leading to successful award for this company. They commenced the construction of this metro station as per the agreements.

Station Layout

Station Layout - To Be Confirmed

Venkateshpura track layout (TBC)
Legend
P#
P#
Station with two tracks and one Island platform
** Under Construction
G Street level Exit/ Entrance
L1 Mezzanine Fare control, station agent, Ticket/token, shops
L2 Platform #
Southbound
Towards → Kalena Agrahara next station is Tannery Road
Island platform | Doors will open on the right Disabled access
Platform #
Northbound
Towards ← Nagawara next station is Kadugundanahalli
L2

Connections

Entry/Exit

See also

References

  1. ^ "Namma Metro Pink Line: Route, Status, Completion Date & More". timesproperty. Retrieved 15 December 2023.
  2. ^ "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
  3. ^ "Namma Bengaluru's Pink Line likely to commence commercial operations by March 2025! Check routes, stoppages, and more". Financialexpress. 18 July 2023. Retrieved 15 December 2023.
  4. ^ Staff Reporter (17 July 2023). "Bengaluru Metro: Pink Line likely to be Operationalised by March 2025". Metro Rail News. Retrieved 15 December 2023.
  5. ^ Staff Reporter (27 September 2023). "Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024". Metro Rail News. Retrieved 15 December 2023.
  6. ^ "Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week". TimesNow. 31 January 2024. Retrieved 1 February 2024.

External links

  • BMRCL English - BMRCL Official Website
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
Portals:
  • icon Bangalore
  • icon Trains
  • icon Transport
  • icon Engineering
  • v
  • t
  • e
Pink Line 4
Depot(s)
  • Kothanur
See also
  • *Stations in Italics are Under Construction